.NET Tutorials, Forums, Interview Questions And Answers
Welcome :Guest
Sign In
Win Surprise Gifts!!!

Top 5 Contributors of the Month
Gaurav Pal
Post New Web Links

warning mesages while processing SSAS 2005 ubes

Posted By:      Posted Date: April 10, 2011    Points: 0   Category :

I am processing SSAS 2005 cubes from SSIS 2008. So i have developed an SSIS 2008 package which first processes all dimensions and then the cubes using "Analysis service processing task". The cubes gets processed form the SSIS package successfully but I also get a warning message for some of the cubes. The warning message is as below:

"Warning: 0x411C0002 at Process CubeA, Analysis Services Execute DDL Task: Server: Operation completed with 1 problems logged."

I am not sure if I just ignore the above warningmessage or look where the problem is being logged?I have no idea where it is being logged. Can anyone tell what I need to look for such a warning message? Did anyone get it before.


Thanks a lot.

View Complete Post

More Related Resource Links

Deadlock for a cube processing - SSAS 2005



I have a scheduled job with a step that calls a cube processing. This job run daily. Some times the processing stops for a deadlock. I have seen that when the processing overcomes 60-70 minutes a deadlock occurs. Is it possible that any settings for the Analysis Server instance can affect to the deadlock occurence?

Many thank for your helps.

Kerberos between MOSS 2007 and SSAS 2005


I realize this is probably going to be one of those vague questions that I am not going to get much help on here, but I thought I'd give this a shot before we go the MS Incident route on monday.

We have tried to setup Kerberos between MOSS 2007 AND SSAS 2005 to no avail.  We have been through the knowledge base articles outlining the setup multiple times with all the experts on MOSS and Security here where I work.  We've used other materials we have on kerberos here.  But the end result is that the double hop is not happening.  We are trying to connect three ways: excel services, ssrs 2005 in integrated mode, and Sharepoint KPI's (using analysis services).  In every case the connection is not happening.

Other details are that the ssrs integrated mode seems to be setup right because I do get a report (albiet all it has is a connection error message).  Excel services works fine if I use the unattended service account, but when I switch the odc file to windows (should cause kerberos to kick in) it fails.  When I try to add a kpi to the kpi list it can't retrieve a list of kpi's from ssas.

In all cases I am the user trying to perform these operations, and I have total access to the cube -- I'm the developer.  I have no problems connecting to the cube directly through excel, so the security at that end passes t

how ssas generate sql queries when processing dimensions and partitions?

hi all, how does ssas2008 generate sql queries to read data from the source, where processing dimensions and partitions? is there any reading meterial that clearly explains how the sql queries are constructed according to properties of dsv, dimensions and measures and partitions.   thanks in advance.Andrew Chen Interested in BI related technologies

Shared dataset in SSRS 2008 R2 running on SSAS 2005

I am trying to create a report in SSRS 2008 R2 using SSAS 2005 as a datasource. My dataset has a date parameter. When I create an embedded dataset in my report everything works fine, but when I create a shared dataset with the exact same mdx query, I get the following error: An error occurred during local report processing. The definition of the report 'xxxx' is invalid. The Value expression for the report parameter 'DateCalendarHierarchy' contains an error: [BC30034] Bracketed identifier is missing closing ']'. Does anybody have any ideas? Is this a bug? Thanks, Louis

Can SSAS 2005 run with Sql Server 2008 database engine?

Are there any known issues of running SSAS 2005 with SQL Server 2008 database engine?

SSIS 2005 - Foreach loop container - Stopping the loop after processing X number of file?

I need to stop the Foreach loop container from processing more files in the folder than desired. Scenario:  If I only want 1 files processed, i need to stop the loop after it finds 1 file.  No matter what the contraints or tests or variables I set, the loop processes all the files in the folder.  This is bad because I need the value of the 1st mapped variable and not the last one it finds. I have tried counting records and setting variables used in the contraints but to no avail  Nothing seems to stop the loop. Please advise

How to change connection string of a pivot table pointing to SSAS 2005 cube using excel 2003?

Hi All,I am not sure if I should have posted this query to Excel 2003 forum. But posting it here as it applies to SSAS 2005 as well.Ok, let me give the background before I tell the actual problem.We have users on ABC domain and the SSAS server is also on ABC domain. Users on this domain can acess the excel pivots by connecting to cube to browse the data. They leave the Userid & password field blank while they setup the connection string and it works fine. Thanks to windows authentication that takes the credentials of user logged in. Let's say I have two users A and B, they login to ABC domain with their own windows ids.  Now when user A creates a excel file having a cube pivot and then sends this file to user B, user B can refresh and modify the same excel file (he can select new measures to pivot, new hierarchies in filters and so on).Now, let's say I have another user, user C. He has excel 2003 installed on his PC and cannot migrate to excel 2007. He is on different domain XYZ but have a valid windows userid on domain ABC. The domain ABC & XYZ can not be setup to have trusted relationship. Now, when user A sends the same excel file to user C. When user C opens the file and try to refresh it or try to modify the pivot by selecting/deselecting any elements, he gets below error prompt:" An error was encountered in the transport layer." and "Errors in the

SSAS 2008 and SSAS 2005

Olap cube created in SSAS 2008 and processed in SSAS 2008 gets same result of measure as the result counted by hand. However, the same cube processed in SSAS   2005 shows incorrect value. What can be the reason?

Excel 2007 connectivity to SSAS 2005 cube

Hello - I am using an excel 2007 odc file to connect to an analysis services 2005 cube (on windows server 2003 R2 OS). I receive the following error message   "Excel was unable to get necessary information about this cube. The cube might have been reorganized or changed on the server" Have already attempted the following fixes but running out of ideas now 1. Added localeIdentifier to ODC file    <odc:ConnectionString>Provider=MSOLAP.3;Integrated Security=SSPI;Persist Security Info=True;Data Source=bisql;Initial Catalog=SLAM ACT BUD; LocaleIdentifier = 1033 </odc:ConnectionString> 2. Ensured that all dimensional attributes which are used in MDX calculations (named sets, calculated members) are set to "AttributeHierarchyEnabled  = True" Running out of steam so any help is greatly appreciated.

SSRS 2005 with SSAS Parameter is not declared

Hello, I'm builind a mdx query to my report in ssrs 2005 with ssas 2005 all on SP3. I'm having the hardest time to add a custom parameter to the query, I add it to the dataser parameters tab ("..." button). Then when I try to use it in my query I get an error: The query uses a parameter, which is not declared. I've seen some examples on the goo.. internet but none seems to work. My query runs fine like this STRTOMEMBER("[dimension].[entity].&[16]") but it fails if I try to do this.. STRTOMEMBER("[dimension].[entity].&[" + @entityid + "]") Am I trying to do impossible? :) Any idea on how to get such filter to work? My filters are a bit complex that's why I can't simply use the "Parameter" checkbox in the query designer mode. Thanks!

SQL Server 2005 Express (Advanced) warning msg. Requires 32-.bit ASP.net

Received the following warning error message while installing SQL Express Advanced. Now when I log onto Management Studio I was expecting to see Reporting Services but only have the database enginge and SQL Compact Edition. Do I need to download and install the 32-bit ASP.NET?  I'm on Windows 7 64-bit ASP.Net is Registered. Required 32-bit ASP.Net to install Microsoft Reporting Services 2005(32-bit).

Trouble to connect report on SSAS 2005

Hello! I have deployed my first report (ssrs2008) using a ssas (2005) cube as data source but I can't get it to work. I setup the credentials to use Windows Authentication in the SSAS data source and when I open the report from the rs server it renders fine, however when I try it from a workstation I get the error below: The SSRS instance is not on the same server as SSAS. Any Clue? Thanks! Cannot create a connection to data source 'TestCube'. The connection either timed out or was lost. Unable to read data from the transport connection: An existing connection was forcibly closed by the remote host. An existing connection was forcibly closed by the remote host

SSAS 2005 - All Member


Hi All,

I've 2 product hierarchies and sales volume should be calculated differently for both the hierarchies.

e.g H1 : Sales volume = vol and H2 : Sales volume = vol * 2.5.

SCOPE ( DESCENDANTS([Product].[H1].[All Product]),
        [MEASURES].[*Sales Volume]);  
    THIS = [MEASURES].[*Sales Volume];

SCOPE ( DESCENDANTS([Product].[H2].[All Product]),
        [MEASURES].[*Sales Volume]);  
    THIS = [MEASURES].[*Sales Volume] * 2.5;

Except for "All" level everything else works fine. How do I make "All member show the correct agg value?

Any help is appreciated.

Thanks very much,


How to create Fact Table and Dimention Table in SSAS 2005 ?


Hi friends,

I am very new to SSAS world.

My question, can any one guide me , how to create Fact Table and Dimention Table ?


Processing SSAS 2008 cube using third party scheduler

What are the different options to process SSAS 2008 cubes automatically using third party scheduler? What is the most recommended approach?

How to customize column names in Drill through action of SSAS 2005?

Hi Everyone,

Can somebody tell me about:How to customize column names in Drill through action of SSAS 2005?

I have defined drillthrough actions in SSAS 2005 cube. Drillthrough action is working very fine.

But while browsing the cube when i drillthrugh the data, my column names are shown as [$Employee Details].[Employee No], [$Employee Details].[Employee Name] etc.

I want to depict it only as Employee No, Employee Name etc.

Please help...


IN SSAS 2005, total count is incorrect for a partial month



IN SSAS 2005, when I navigate Cube->browser and I drag my fields "Day of week" to rows and couple of measures namely "M1" and "M2" to columns

and applied a filter "hierarchydate" in the filter section(eg partial month Jan 10 to Jan31), I get the total count incorrect. I also have the following observations

1) for example "Instead of giving Sunday "Sub total" for that partial month i.e "Jan 10 to Jan31", it is displayed with all the Total Sunday's count for all the years

2) IN Cube-> browser , it is working fine, if I apply the filter in "select dimesion" section instead of applying filter in "drop filter fields section"

Is there any such kind of issue in SSAS 2005?

Please reply me ASAP if you have any information

ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend