.NET Tutorials, Forums, Interview Questions And Answers
Welcome :Guest
Sign In
Win Surprise Gifts!!!

Top 5 Contributors of the Month
david stephan
Gaurav Pal
Post New Web Links

Source Control Explorer tab is shown when pressing 'S' key in Workflow Designer

Posted By:      Posted Date: October 01, 2010    Points: 0   Category :Windows Application

I'm using Visual Studio 2010 Ultimate and I also have TFS Server 2010 Power Tools installed. The problem I'm experiencing every time I load the Workflow Designer is that whenever I press the S key, Visual Studio takes me to the "Source Control Explorer" tab. This would happen if you were editing the title of any activity on the designer or just had the focus on the designer itself.

I checked the keyboard shortcuts for this tab (View.TfsSourceControlExplorer), and verified that there are none assigned to it. Nonetheless, I tried to assign a shortcut to the tab (both at a Global and Workflow Designer level), in order to see if the behavior would be overwritten, but I had no success.

Any ideas on how I can overcome this problem?

View Complete Post

More Related Resource Links

How to install the Css Friendly Control Adapter Source Code


Hi guys really new to ASP.NET I was trying to install the CSS Friendly control adapter but for some reason the instructions on the website seems outdated. I downloaded all the files (Source Code, DLL, Browser) I believe I need to add the DLL file to my website's Bin folder and the Browser file to the APP_Browsers folder is this correct? After I place this files how to I get it working? what do I have to do?

Also if I want to create a new DLL file from the Source code how do I do these? I opened the web-site with Visual Studio 2008 and I can see all the files in the solution explorer? But how do I compile this to a DLL file? I tried doing a build solution but all I get is an .sln file???

Any help would be greatly appreciated

Thanks in advance


Virtual Source Code Control Systems: Promoting and Managing Projects using Visual SourceSafe


Source code control systems like Microsoft Visual SourceSafe can simplify just about any development project, and make it easier for your code to move safely among individual programmers, development teams, and project stages. Visual SourceSafe provides an object model that you can use as the basis of your own customized source code control environment. To give you an idea of what is possible, we'll walk you through the elements of a browser-based source code control system built with Visual SourceSafe, ASP, and VBScript. This simple system lets members of your team build, label, and promote individual files or entire projects, and to reverse promotions.

Ken Ramirez

MSDN Magazine May 2000

Problem getting applicaton to run after retrieving it from source control software.


I am restoring my asp 2.0 app from a source control project to my local drive.

The application was originally created on a different PC but was created with Visual Studio 2005,

ASP.net 2.0.

The source control add-in (Harvest) is not working correctly so I retrieving and saving my web app

outside of Visual Studio.

I finally put all the pieces of the web app back together but now when I compile my app I get the following message:

Build (web): Could not load the assembly 'App_Web_myApplication.master.cdcab7d2'. Make sure that it is compiled before accessing the page.

Will I have to start over ?

Thanks for your insights !

Trying to send email using Sharepoint Designer 2007 workflow and email enabled list


I have a a list that recieves email. I have few fields that shows me the originator: "E-Mail From" and "E-Mail Sender".

I am trying to create a workflow that will generate an auto reply to the originator but the SPD fails to recognize the email address in these two fields. It's either truncating part of it or uses the html ( href=mailto:Demo@DemoSomething.com) in the To field.

Thank you,


How can I implement this workflow scenario with SharePoint Designer?



I have a document content type and a library which contains this content type. here is what I want to do:

- when user creates a new document in this library, he will enter some user  names with people picker and then a message including some columns of the content type will be sent to that users. And then, at a certain date (lets say 1 day before a date that is one of the site columns) another email, a reminder will be sent.

I havent been able to find :

1- how can I replace a people picker field on workflow initiation form and how can I make it sent email to the user.

2- How can I make it sent a reminder email 1 day before the date that is stored in one of the columns of the content type(current item)

any help would be welcome,


How to use display Text in Hyperlink For SharePoint 2010 Designer Workflow


In SharePoint 2007 Designer, I have used the Hyperlink column to store the link "http://www.sharepoint.com/Default.aspx, Details". The details text will be shown in the Hyperlink column. Everything works fine in sharepoint 2007 Designer workflow.

In SharePoint Designer 2010 Workflow, I used the same method but the hyperlink column is displaying the full text "http://www.sharepoint.com/Default.aspx, Details" instead of only Details


Video: Microsoft Visio 2010 and Microsoft SharePoint Designer 2010 Workflow

Learn the specific roles Visio 2010 and SharePoint Designer 2010 play in the development process and how these tools can be used in concert to create a workflow. (Length: 13:22)

Explorer Browser Control

I am having a problem with the Explorer Browser sample code from Windows 7 API Code Pack. I need to programmatically highlight and give focus to an item in the left hand pane of an Explorer Browser control just as if I had clicked on it. "eb.ExplorerBrowserControl.Navigate(   CType(KnownFolders.Computer, ShellObject))" will highlight it but will not give it focus.  How do I simulate in code what happens when I acutally click on 'Computer' in the left-hand pane? Then how do I send the Tab Key?  Will this work? "SendKeys.Send("{TAB}")"

Share Point Designer 2007 Workflow (Sequential) - multi-collect data from user

I am currently building a multi-step workflow using ShrePoint designer for MOSS2007. I am getting a bit confused as to if I have an error or if I am doing something incorrect. Here is what I have going. My workflow consists of something similar to the following New document comes in, a collect data from user routine is ran and assigned to a reviewer. My understanding when I create a collect data from user WorkFlow step is any data I request is saved in the "Tasks" list. Therefore I need to grab the workflow task ID in order to later lookup what the reviewer submitted... I understand this...   However, I have one more collect data from user workflow step and I have one more item to collect. Even though this is a brand new collect data from user workflow step - does the collected data still go into the "Tasks" list? In other words, if I have two steps in a workflow and both of these steps are "collect data from user", does the data from both steps go into the same "Tasks" list?  I could see how this might be possible as long as the Task list columns contain all the items for all the different "collect" data from user steps.  I don't see two different Tasks lists representing or named "Reviewer" or "Final" or anything, so I assume the items are all in "Tasks"   However..

null value shown in excel source editor when preview

hi all i am uploading excel (.xlsx) file. when i preview in excel source editor it shows all numeric value as 'null' value.  it taking it has Unicode string [DT_WSTR] data type. i formatted all cells trying with general and text type but it still shows as null value. what could i do to this?  thank you ppl, romal.

How to get User group in SharePoint Designer 2010 within workflow?

Hi, How to get user group in sharepoint designer within workflow? Basically I have to compair that current user is belongs to particular group or not.  How can I get check user group in workflow's if condition? G. Goyal

SharePoint Designer Workflow Changes not Posting

Hey Community, I've encountered a tough problem.  I have made some changes to a SharePoint Designer (SPD) workflow.  I click Finish in the workflow designer and the changes are saved without error.  However, when I run the workflow on the actual site, it's still the old workflow design, not the workflow with the recent changes.  On this site I have Full Control permissions.  No errors appear in the workflow.  I do not have access to the CA, SP Logs, or Event Viewer. I hope you can help!Tom Molskow SharePoint Architect - If I solved the issue please propose my reply as the answer - Thanks!

Hosted Designer fails to load workflow xaml that has InArguments with default values (xaml saved by

I have hosted the designer in our app. Using the hosted designer, workflows are saved as xaml to a database. When an end user wishes to edit a workflow the xaml is downloaded to a file and loaded into the designer via the .xaml file. The user can also associate assemblies with the workflow and there is a mechanism which makes sure that these assemblies are loaded into the appdomain and available. The problem we are hitting occurs when the top level activity (Sequence) has InArgument with default value. I create a simple Sequence, add InArguments (type of Int32 and String)  and set some default values. I save the workflow xaml to the database and close down the designer. When I wish to edit the workflow and try to load I get the following errors Could not find member '{clr-namespace:}_e905.argument3'. Could not find member '{clr-namespace:}_e905.argument1'. suggesting that some assembly/namespace missing. Here is the xaml I try to load: <Activity mc:Ignorable="sap" x:Class="{x:Null}" this:_e905.argument3="99" xmlns="http://schemas.microsoft.com/netfx/2009/xaml/activities" xmlns:mc="http://schemas.openxmlformats.org/markup-compatibility/2006" xmlns:mva="clr-namespace:Microsoft.VisualBasic.Activities;assembly=System.Activities" xmlns:s="clr-namespace:System;assembly=mscorl

How to start a workflow programmatically that was created in Sharepoint designer 2010?

Trying to start a workflow from code.  The workflow itself has been created in SPD 2010, which from what I understand, means that there is no assembly until the first time it's ran.  However, when I try to find the association record, that doesnt exist.  Is this becuase the 'code' hasnt been compiled yet?  If so, how can I have sharepoint start the just-in-time compiler for a declarative based workflow, so that can kick it off with in code? tia Rocky SandersRocky Sanders

Error customizing Approval Workflow in SharePoint Designer

When attempting to customize OOTB Approval Workflow, message "Workflow is read only?"  Request copy errors with "Server could not complete your request" Details button produces blank.  Any clue?  I am the site collection administrator for the site and the secondary farm administrator.

Designer workflow + unable to edit task

I use the SPD to create a custom workflow which will assign to-do task to users. The workflow is attached to a list library in a subsite and users only have view-only permission to the subsite (users are added to the subsite directly, not inside any sharepoint group).  In order for users to complete the assigned task, I have broken the permission inheritance and change users to have contribute permission on the Task list.   The workflow would trigger as expected and a new task is created for the user. The user can see the "edit task" link in the task item but when clicked "edit task", an "access denied" error occurs.   Under further investigation, I notice access are granted for sharepoint group e.g. site visitors, site members on URL http://....../workflow/workflow_name/newtask.aspx , and only when I create the workflow under the site administrator account. If I create the workflow under an account which also has "Full Control" to the subsite, No access are granted to the workflow library at all.   What permission levels do I need to create workflows in designer really? Does it make a difference if the workflow is on a top-root site or subsite? Full control on the top-root site or subsite?   Thanks in advance.
ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend