.NET Tutorials, Forums, Interview Questions And Answers
Welcome :Guest
Sign In
Win Surprise Gifts!!!

Top 5 Contributors of the Month
Gaurav Pal
Post New Web Links

Detecting changes to a workflow in rehosted designer.

Posted By:      Posted Date: September 29, 2010    Points: 0   Category :Windows Application

Is it possible to check to see if any changes were made to a workflow in the rehosted designer? I'd like to prompt the user to save their changes if they are trying to close or load a different workflow and they have not yet saved them.


View Complete Post

More Related Resource Links

Working with sub-workflow in rehosted designer?


Is it possible to work with a sub-workflow (i.e. subset of the workflow in the designer). For example a sequence, a flowchart, or any activity inside the workflow.

My idea is something like these:

  • Save the subworkflow to a file (for example, save the selected Sequence activity)
  • Load a saved subworkflow and add it into current workflow
  • Add a sub-workflow as an item in toolbox
Are these even possible?

How to get Rehosted Workflow Designer selected property from PropertyGrid



How to find the selected Property from PropertyGrid in Rehosted Workflow Designer.

Suppose if I select the Assign activity To Property, I need find this selected property from code when I click some button.

Hanumantha Rao

Trying to send email using Sharepoint Designer 2007 workflow and email enabled list


I have a a list that recieves email. I have few fields that shows me the originator: "E-Mail From" and "E-Mail Sender".

I am trying to create a workflow that will generate an auto reply to the originator but the SPD fails to recognize the email address in these two fields. It's either truncating part of it or uses the html ( href=mailto:Demo@DemoSomething.com) in the To field.

Thank you,


How can I implement this workflow scenario with SharePoint Designer?



I have a document content type and a library which contains this content type. here is what I want to do:

- when user creates a new document in this library, he will enter some user  names with people picker and then a message including some columns of the content type will be sent to that users. And then, at a certain date (lets say 1 day before a date that is one of the site columns) another email, a reminder will be sent.

I havent been able to find :

1- how can I replace a people picker field on workflow initiation form and how can I make it sent email to the user.

2- How can I make it sent a reminder email 1 day before the date that is stored in one of the columns of the content type(current item)

any help would be welcome,


How to use display Text in Hyperlink For SharePoint 2010 Designer Workflow


In SharePoint 2007 Designer, I have used the Hyperlink column to store the link "http://www.sharepoint.com/Default.aspx, Details". The details text will be shown in the Hyperlink column. Everything works fine in sharepoint 2007 Designer workflow.

In SharePoint Designer 2010 Workflow, I used the same method but the hyperlink column is displaying the full text "http://www.sharepoint.com/Default.aspx, Details" instead of only Details


Video: Microsoft Visio 2010 and Microsoft SharePoint Designer 2010 Workflow

Learn the specific roles Visio 2010 and SharePoint Designer 2010 play in the development process and how these tools can be used in concert to create a workflow. (Length: 13:22)

Enumerating Variables & Arguments in Rehosted Designer

I'm trying to enumerate the variables and arguments of a workflow after I load it into my rehosted designer.  I see that I can use ActivityMetadata.GetArgumentsWithReflection() and ActivityMetadata.GetVariablesWithReflection() but those require that I have ActivityMetadata to start with.  So the real question is, how do I get the ActivityMetadata once I've done MyWorkflowDesigner.Load(XamlPath);?Thanks in advance.ChuckChuck Berg | Consulting Engineer | Corporate IT - Station Casinos, Inc.

Share Point Designer 2007 Workflow (Sequential) - multi-collect data from user

I am currently building a multi-step workflow using ShrePoint designer for MOSS2007. I am getting a bit confused as to if I have an error or if I am doing something incorrect. Here is what I have going. My workflow consists of something similar to the following New document comes in, a collect data from user routine is ran and assigned to a reviewer. My understanding when I create a collect data from user WorkFlow step is any data I request is saved in the "Tasks" list. Therefore I need to grab the workflow task ID in order to later lookup what the reviewer submitted... I understand this...   However, I have one more collect data from user workflow step and I have one more item to collect. Even though this is a brand new collect data from user workflow step - does the collected data still go into the "Tasks" list? In other words, if I have two steps in a workflow and both of these steps are "collect data from user", does the data from both steps go into the same "Tasks" list?  I could see how this might be possible as long as the Task list columns contain all the items for all the different "collect" data from user steps.  I don't see two different Tasks lists representing or named "Reviewer" or "Final" or anything, so I assume the items are all in "Tasks"   However..

How to get User group in SharePoint Designer 2010 within workflow?

Hi, How to get user group in sharepoint designer within workflow? Basically I have to compair that current user is belongs to particular group or not.  How can I get check user group in workflow's if condition? G. Goyal

SharePoint Designer Workflow Changes not Posting

Hey Community, I've encountered a tough problem.  I have made some changes to a SharePoint Designer (SPD) workflow.  I click Finish in the workflow designer and the changes are saved without error.  However, when I run the workflow on the actual site, it's still the old workflow design, not the workflow with the recent changes.  On this site I have Full Control permissions.  No errors appear in the workflow.  I do not have access to the CA, SP Logs, or Event Viewer. I hope you can help!Tom Molskow SharePoint Architect - If I solved the issue please propose my reply as the answer - Thanks!

Hosted Designer fails to load workflow xaml that has InArguments with default values (xaml saved by

I have hosted the designer in our app. Using the hosted designer, workflows are saved as xaml to a database. When an end user wishes to edit a workflow the xaml is downloaded to a file and loaded into the designer via the .xaml file. The user can also associate assemblies with the workflow and there is a mechanism which makes sure that these assemblies are loaded into the appdomain and available. The problem we are hitting occurs when the top level activity (Sequence) has InArgument with default value. I create a simple Sequence, add InArguments (type of Int32 and String)  and set some default values. I save the workflow xaml to the database and close down the designer. When I wish to edit the workflow and try to load I get the following errors Could not find member '{clr-namespace:}_e905.argument3'. Could not find member '{clr-namespace:}_e905.argument1'. suggesting that some assembly/namespace missing. Here is the xaml I try to load: <Activity mc:Ignorable="sap" x:Class="{x:Null}" this:_e905.argument3="99" xmlns="http://schemas.microsoft.com/netfx/2009/xaml/activities" xmlns:mc="http://schemas.openxmlformats.org/markup-compatibility/2006" xmlns:mva="clr-namespace:Microsoft.VisualBasic.Activities;assembly=System.Activities" xmlns:s="clr-namespace:System;assembly=mscorl

How to start a workflow programmatically that was created in Sharepoint designer 2010?

Trying to start a workflow from code.  The workflow itself has been created in SPD 2010, which from what I understand, means that there is no assembly until the first time it's ran.  However, when I try to find the association record, that doesnt exist.  Is this becuase the 'code' hasnt been compiled yet?  If so, how can I have sharepoint start the just-in-time compiler for a declarative based workflow, so that can kick it off with in code? tia Rocky SandersRocky Sanders

Error customizing Approval Workflow in SharePoint Designer

When attempting to customize OOTB Approval Workflow, message "Workflow is read only?"  Request copy errors with "Server could not complete your request" Details button produces blank.  Any clue?  I am the site collection administrator for the site and the secondary farm administrator.

Designer workflow + unable to edit task

I use the SPD to create a custom workflow which will assign to-do task to users. The workflow is attached to a list library in a subsite and users only have view-only permission to the subsite (users are added to the subsite directly, not inside any sharepoint group).  In order for users to complete the assigned task, I have broken the permission inheritance and change users to have contribute permission on the Task list.   The workflow would trigger as expected and a new task is created for the user. The user can see the "edit task" link in the task item but when clicked "edit task", an "access denied" error occurs.   Under further investigation, I notice access are granted for sharepoint group e.g. site visitors, site members on URL http://....../workflow/workflow_name/newtask.aspx , and only when I create the workflow under the site administrator account. If I create the workflow under an account which also has "Full Control" to the subsite, No access are granted to the workflow library at all.   What permission levels do I need to create workflows in designer really? Does it make a difference if the workflow is on a top-root site or subsite? Full control on the top-root site or subsite?   Thanks in advance.

Change Variable and Argument editor in workflow designer?

Is it possible, in Beta 2, to customize the behaviour of the editing grids use for entering data about a workflow's variables or arguments in the workflow designer?  Can I:- add my own custom column to the grid?- can I customize the variable type drop down editor? (e.g. have my own editor or otherwise filter the list of types)- can I change the "default" expression editor (and possibly remove it)?Thanks,Notre

how to send an email using sharepoint designer workflow when an item equals to end time

hi, How to trigger the workflow when current time is equl to end time. I need to send an document when  current time is equl to end time. I am using designer workflows(sharepoint 2007).I have created a variable and i am able to get todays date but not able to get time by default i am getting 12:00:00 Am.i want to get current time. can u please tell me.

Sharepoint Designer Workflow Problem

Hy there   I have a question.. I have started with WSS 3.0 and sharepoint designer. My problem is, i have a workflow...first creates a new element in the second list and the second flow starts.. The Problem is , some errors have occured in the log list.   I have multiple errors like this : 8xfr    Verbose     PermissionMask check failed. asking for 0x00000005, have 0x00000000, But i have full permission!   Second error : event handler error Event ID: 6875, i have already tried to repair sharepoint services ..but already the error exists in my loglist.   A Phenomen is , the workflow worked a week ago pretty fine, ..i had made some changes to the tasklist (name)..and so ,..and the workflow wont proceed successfull..after that i created a new website and tried to rebuilt my workflow...nothings changed... Curious is, that i dont get email information, about assigned tasks to my account,...and the "Wait until "... procedure wont work..you can make changes.... the list already stays in the "In process" status.   Hopefully someone has helpfull infos for me   Nice greets   Sascha    
ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend