.NET Tutorials, Forums, Interview Questions And Answers
Welcome :Guest
Sign In
Win Surprise Gifts!!!

Top 5 Contributors of the Month
david stephan
Gaurav Pal
Post New Web Links

Deploy a workflow using WSS 3.0 without Moss?

Posted By:      Posted Date: September 26, 2010    Points: 0   Category :SharePoint

Hello all,

I just want to know if it is possible to deploy a workflow using WSS 3.0 without having a MOSS?

If so, how is that done using Visual Studio 2008

If not, what other options do I have.

 Currently, I am using WSS 3.0 operating on Windows Server 2008 using Visual Studio 2008 and I also have Sharepoint Designer 2008

Thanks in advance,



View Complete Post

More Related Resource Links

Web Service Workflows: Deploy Distributed Business Processes With Windows Workflow And Web Services


Due to the distributed nature of a business process it makes sense for a workflow to be deployed as a distributed application. See how Windows Workflow and Web Services hold the key.

Israel Hilerio

MSDN Magazine October 2006

VS Studio WorkFlow Failed on Start in MOSS 2007 ON Windows Server 2008 64 Bit


I have created a sequential sharepoint workflow in WSP Builder in my Sharepoint Server and Deployed it.

But the workflows says Failed on start and retrying ans stops there forever says couldn't start the workflow.

I repaired .NET Framework 3.5sp1 installed

 tried this

 1. I tried again, in C Prompt:  Lodctr "c:\Windows\Microsoft.Net\Framework\v3.0\Windows Workflow Foundation\perfcounters.ini"  it says initiation file cannot be found

2   i again tried this C prompt Lodctr /R "c:\Windows\Microsoft.Net\Framework\v3.0\Windows Workflow Foundation\perfcounters.ini"

it says reloaded  from the system restored

i am still getting the same error.

When i manually go to my  C:\Windows\Microsoft.NET\Framework\v3.0\Windows Workflow Foundation i can see a folder for SQL that's it nothing more than that..

I dont know what is happening i am trying it from 2 days and still no solution.

any ideas would be real great help for me.

My system is 64 bit , Window server 2008, MOSS SP2, Visual Studio 2008 Version 9.0.30729.

.Net Framework 3.5 sp1

and WSP builder the one from Codeplex for 64 bit machines




We are using Office 2003 standard edition SP3 in our work place in which we are not able to edit documents with workflow .

Any suggestions or alternative option to use this feature is most welcome.




Contact Selector Failed in MOSS Workflow Modification Infopath Form

Hi,   In my proof of concept Moss 2007 WF, I tested an Infopath modification form successfully.  Then the contact selector ActiveX control was added but it failed to open using the modification link of the workflow page.  In a different form for the WF initiation, I similarly created two CS controls and it worked there.  A snippet of the MOSS error is below   Object reference not set to an instance of an object.   at Microsoft.Office.InfoPath.Server.Controls.ContactPicker.RenderClientViewDataLeafContent(XPathNavigator context, IRenderContext renderContext, ControlViewData controlViewData, ScriptWriter writer)    at Microsoft.Office.InfoPath.Server.Controls.LeafControl.RenderClientViewDataContent(XPathNavigator context, IRenderContext renderContext, ScriptWriter writer)    at Microsoft.Office.InfoPath.Server.Controls.BaseControl.RenderClientViewData(XPathNavigator context, IRenderContext renderContext, ScriptWriter writer)    at Microsoft.Office.InfoPath.Server.Controls.ContainerControl.RenderClientViewDataContent(XPathNavigator context, IRenderContext renderContext, ScriptWriter writer)    at Microsoft.Office.InfoPath.Server.Controls.BaseControl.RenderClientViewData(XPathNavigator context, IRenderContext renderContext, ScriptWriter writer)    at Microsoft.Office.InfoPath.Server.Controls.CollectionControl.RenderClientViewDataContent(XPathNavigator context, IRenderContext rend

Book to learn and Develop enterprise application using InfoPath with workflow in MOSS 2007

Hi all, I'm new to infopath forms and i dont find much articles to develop enterprise application (I'm coding for an ERP module). I have sys environement of MOSS 2007, windows 2008 (64 bit), MS SQL 2008  Though it is easy to design and publish form to a site,  devloping the form with more business rules and validation seems to be vague for me. So please refer a good book to find the deveopment procedures to master Infopath with workflow integration. it is quite urgent. Thanks Gomathi Sha   sharepoint development

Deploy reusable Workflow on SharePoint Farm with other language pack

Hi all, I created a reusable workflow on my development system with no language pack installed. I saved the workflow as a template and saved the generated wsp. After that I added the wsp to a SharePoint farm at out customer (with the dutch language pack installed) and deployed the wps. Everything was looking good, but the WSP didn't creae a feature which I could activate, so I was not able to use the Workflow. Should it be possible to create a reusable workflow on a system with no langualge pack installed and install it on another system with a language pack installed? Johan.

MOSS 2007 - SharePoint Designer Workflow failing when using group vs individual user

I am creating a simple workflow in SharePoint designer that will email a selected user when a list is modified.  I am applying the condition "if modified by" in Designer.  This condition works fine and the email is sent when I select a specific user myDomain\username.  It does not work when I attempt to associate a SharePoint group with the "if modified by" filter. In my example the list has only one SharePoint group associated with it, this is the only group with permissions for the list.  The group contains multiple users. The workflow is successful with the following scenario: if modified by myDomain\user1 or if modified by myDomain\user2 The workflow fails with the follwoing scenario: if modified by mySharePointGroupName  (which includes myDomain\user1 and myDomain\user2) This would be an ungodly if statement with a large membership SharePoint group.  This would also be a nightmare as people leave the organization and their account credentials are left in the large if statement in the workflow.  Looking for the modified condition when associated with a group seems like the logical way of doing this. I also tried "myDomain\domain users" which accounts for all user in my domain, this failed as well. Any advice would be greatly appreciated.

how to deploy a workflow design in SharePoint Designer 2007 in a list from development server to pro


how to deploy a workflow design in SharePoint Designer 2007 in a list from development server to production server. 

 i create a workflow in a list with SPD 2007 . I want to deploy it to production server who i can do this.

Thanks and Regards Er.Pradipta Nayak

Deploy infopath 2010 form template to MOSS (saved as Infopath2007 format)

I saw this post on another site and this happened to me as well.  I am trying to create a web form with controls, chose WebForms for Infopath2007 and changed the code to C# for Infopath 2007 and tried to deploy the form to the Infopath forms solution in Central Admin and was unable to do so.  any suggestions? 


I have an interesting issue while deploying a VSTO enabled form today. For

some odd reason while performing stsadm -o verifyformtemplate -filename

foobar.xsn, it returned a "FatalError : The form cannot be converted because

it was designed for a later version of InfoPath Forms Services.".

Has anyone else tried deploying a InfoPath 2010 form with managed code in a

MOSS environment?? I'd hate to go back to InfoPath 2007, I love the new

ribbon. :D


Workflow with instantiation form in VS 2008 for MOSS 2007


Guys. I have a MOSS 2007 install, using VS 2008.

I am trying to create a workflow in VS that simply does the following:

On Start, goes to an instantiation form. This collects one field of data. When this is submitted, the workflow updates a couple of fields, then finished. Sounds easy huh.... It sure is in SPD, but in VS it isn't so easy. I am also following Robert Shelton's blogs on this (if you have seen them).

So I have my workflow project, and for the pages, am putting them in their own folder  in the LAYOUTS within 12 hive.

I am getting an error of

Object reference not set to an instance of an object. at InstantiationForm_InstantiationForm.serializeInstantiationFormDataToXML() , but I can't debug it (even when attaching to W3WP.exe).

My aspx page code:

<%@ Page Language="C#" AutoEventWireup="true" 

sync to a list using project 2010 and invoke a workflow to create site in MOSS 2010



i want to know if a workflow can run when it detects a sync has been done with a list with project 2010 ?


How to deploy SharePoint Designer Workflow to Production without using SPD

I created a few workflows using SharePoint Designer on the development server and now I want to deploy those workflows to production server. As the SharePoint Designer access has been blocked on the production environment, how am I going to deploy them? I saw some articles on the feature deployment, however it mention this is not officially supported by Microsoft. Is there any other ways? And I also need the detailed steps on the SPD workflow feature deployment if that works. Any reference? Thanks in advance.

How to deploy Aspx Pages in to MOSS 2007?


I need step by step process for deploying aspx pages into sharepoint 2007.

How to Deploy MOSS Site Collection using backup/restore with DB attach

Can anyone give pointers on Deploying Moss Sites from Development Environment to Production Envirnment Using backup/restore with DB attach?? TIA
Thanks, Devi Prasad M

Not able to deploy excel sheet in MOSS 2010


I have an issue while publishing my excel sheet (2010) to sharepoint doc library. Here is the steps which I followed :

1. Created my excel report (I am using MS Office 2010 Professional Plus)

2. clicked on file -> save & send ->save to sharepoint

3. here i got two option First is the publish option and i chose to publish sheet1 and second option was "brows for a location".

I clicked on this and given doc library path to deploy this excel sheet, but this is not accepting given path and giving error msg as path does not exist. 

Is this the right way to deploy excel sheet in MOSS 2010?

Even that path is accessible from "my computer window" . I dont know what went wrong.

Any help in this regard would be highly appreciated.

Thanks in advance . 

How do I "Deploy" or install my Workflow Solution




I have a VS2010 Solution that includes two Window service hosted workflows. My solution uses WCF and MSMQ messages from the first service to pass messages to the second service. I have created setup program before for .NET Windows forms applications - can I do the same for my service-hosted workflows? What about creating the message queue, and the sql database?

I've read a little about AppFabric; is this a better route to go?





moss 2007 workflow error failed on start(retrying)


i am getting this error "failed on start(retrying)" on a custom workflows.

The error does not occur very frequently, once a week (the workflow is triggered roughly 50 times a day).

Any ideas? Or where can I get more details on this error (some log files elsewhere?)



ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend