.NET Tutorials, Forums, Interview Questions And Answers
Welcome :Guest
Sign In
Register
 
Win Surprise Gifts!!!
Congratulations!!!


Top 5 Contributors of the Month
david stephan
Santhakumar Munuswamy
Fauzul Azmi
Asad Ali
Post New Web Links

SharePoint 2010 sync with Oracle OID

Posted By:      Posted Date: September 22, 2010    Points: 0   Category :SharePoint
 

Can anyone have information to share on,

 

As to how SharePoint 2010 sync with Oracle OID?

Is it supported from Microsoft? and

What are the ramifications?

 

Any help is highly appreciated.




View Complete Post


More Related Resource Links

How SharePoint 2010 sync with Oracle OID?

  

Can anyone have information to share on,

 

As to how SharePoint 2010 sync with Oracle OID?

Is it supported from Microsoft? and

What are the ramifications?

 

Any help is highly appreciated.


Sharepoint 2010: User Profile Sync with Person attributes

  
Sorry for opening another post following this, but I think this case is quite concrete: http://social.msdn.microsoft.com/Forums/en-US/sharepoint2010general/thread/2fa02093-630e-4131-bdc7-0b979067f601 When trying to configure in Sharepoint 2010 - User Profile Application, an additional sync source from BDC (as at least, one LDAP Profile is required). The first approach was to create a straightforward SQL Connection with SP Designer, and it seemed everything ok, except I'm not able to setup synchronization of "Manager" property, which is great in order to see Silverlight Organization Explorer Webpart. As I have read in the previous post, someone pointed to setup a BDC with Visual Studio 2010, so one attribute is of type: Microsoft.SharePoint.SPUser. It seamed very logical, and so I tried to do such task. Once I have deployed correctly a BDC with this strong type (SPUser), the result is that I'm still unable to see any attribute when trying to synchronize Manager attribute. In Sharepoint 2007 this was possible, but not able in SP 2010. Any idea of how to do it? Just a bug? I have one very dirty workaround: setup a Timer job to run after Sync, so I can setup this field by code. But, for doing this, I would not need to run Sync process with BDC anymore.    Evotec Consulting

Trying to SYNC Project Professional to Sharepoint 2010 - what template do I use?

  
I want to use Sharepoint 2010 to sync, and track/record changes initiated from my Project Professional 2010 projects.  The intent is to have a web view (ideally editable) for my team to track work progress. Documentation is light right now for Sharepoint 2010/Project 2010.  Does anyone know: 1) Can Project Pro 2010 be sync'd with only the generic TASKS list template, or can it (should it) be sync'd with one of the other templates - like PROJECT TASKS, ISSUES LIST, or STATUS LIST? 2) Are there any Microsoft mapping diagrams showing what MS Project 2010 fields are mapped to Sharepoint 2010 fields? Since this jumps between 2 platforms, please let me know if I need to address this on the MS Project Pro 2010 forum.  Thanks. 

Is there a way to sync SharPoint 2010 Site to a BPOS SharePoint Site?

  
Hello, I would like to know what can i use to sync a sharepoint 2010 Site to a BPOS sharepoint 2007 Site? Also could this be done by pulling the webservice for sharepoint 2007 site?

Is there a way to sync SharPoint 2010 Site to a BPOS SharePoint Site?

  
Hello, I would like to know what can i use to sync a sharepoint 2010 Site to a BPOS sharepoint 2007 Site? Also could this be done by pulling the webservice for sharepoint 2007 site?

Is there anyway to Sync SharePoint 2010 table to MOSS 2007 table?

  
Hello, I would like to know what can i use to sync a sharepoint 2010 table to a sharepoint 2007 table? Also could this be done by pulling the webservice for sharepoint 2007 site?

SharePoint sync with Project 2010 - issues

  

I am having some issues with syncing project 2010 and sharepoint.

The following scenario works well...

Create plan.
Sync to sharepoint list.
Save Project file.


However the following scenario  does not work well...

Create plan.
Sync to Sharepoint list.
Forget to save project file.

When i re-open project file and sync, i get the error...

The task list was last synchronized to a different project plan. If you continue the task list will be appended to the project plan.
If I continue at this stage then i get a naming error.

One workaround is to delete all the project plan tasks and re-sync.
This brings all the sharepoint tasks back into the project file..
However, I cannot use the existing milestone field in SharePoint to sync with the project file.

Is there any way to sync project fields into existing columns in SharePoint?

I do not want to create a new column as i have a number of views with the old milestone column as part of a filter.

Any ideas?


Sync MS project with SharePoint 2010

  

Hi,

actually i would like to perform a sync between ms project 2010 and sharepoint list, i want to actually create some sites and lists in sharepoint when i click the sync button in ms project. is their anyway i can do this ? thanks 


Sharepoint 2010 AD Sync - missing picture from AD to pictureURL

  

Hi all:

I have followed Jie Lie (Technical sharepoint Product Manger) steps in entirety (http://blogs.msdn.com/b/opal/archive/2009/11/19/user-profile-sync-setup-in-sharepoint-server-2010-beta.aspx), my sync with AD is working fine except it is not pulling the pictures in the AD.

Here is my issue, we have photos of all employees stored as domain.xyz.jpg in the custom attribute (emp_pics_2001) with type string, but the picture url type is url (is this the culprit type change), I am using the custom attribute to map the field in the Sharepoint 2010 miis client.

I am using the below url to do the set up: http://goodbadtechnology.blogspot.com/2010/05/setting-up-pictureurl-user-profile.html

i did check the profile db picture url field is NULL, i have all the other values for person except the picture.., I have already wasted more than 2 days in figuring this out

If i just get domain.xyz.jpg pulled to sharepoint, then i can prefix a url in front of it using powershell
I am using a full trusted service account with full permissions to the domain

please help me out..

thank you

Neel

Need Clarifications on SharePoint 2010 User Profile properties and Sync database security

  

Need few clarifications on SharePoint 2010 user profile sync. I’ve answered some of them but need confirmation/clarity on this front.

  1. Is there option to disable ‘email address’ import from AD?
    Yes. Can disable that property mapping.
  2. Possible to send mails (user alerts) from SharePoint without the user profile property ‘email address’ mapped?
    Yes. User alert mails from SharePoint will work without ‘email address’ mapped in user profile DB.
  3. In case email address too is imported into SharePoint, can we bulk export them from SharePoint? If Yes, how to security harden that database?
    Not Sure. I believe Farm admin account/sync account has access to do this profile DB.

 Thanks in advance for your advice.<

Creating a Folder in SharePoint Server 2010 From Oracle Form

  

Dear all,

I have an Oracle Form where I am recording Employee Details.

What I want is whenever i am recording an Employee Details I want a folder for the employee to be created in the SharePoint Server 2010 site.

Is this achievable?

If so, please guide/help me.

Many

Thanks


Creating a Folder in SharePoint Server 2010 From Oracle Form

  

Dear all,

I have an Oracle Form where I am recording Employee Details.

What I want is whenever i am recording an Employee Details I want a folder for the employee to be created in the SharePoint Server 2010 site.

Is this achievable?

If so, please guide/help me.

Many

Thanks


Accessing Oracle Table data and updating using SharePoint 2010 List

  

Hi,

We are trying to access Oracle database table through SharePoint 2010 List. The functionality required is, the user should be able to read the data from the Oracle table in to the SharePoint 2010 List and should also be allowed to update the list and in turn the data should be updated back in to the oracle table.

Over and above any changes made to the oracle table by users, should be updated in the sharepoint 2010 list. Which means the users require a two synchronisation from SharePoint 2010 List to Oracle table and vice versa.

let us know if anyone has worked on this before.


Ram

Short Overview of SharePoint Features in Visual Studio 2010

  
As you probably know, Visual Studio 2010 was announced earlier this week and it contains a lot of cool features and project templates for SharePoint developers. Below is a short overview for some of the SharePoint development related features and project templates.

How to get more information about the exceptions that can happen in SharePoint 2010 projects?

  
In case there is an exception anywhere in the SharePoint 2010 project (most common place an exception would happen is during deployment of your SharePoint project, custom deployment configuration or custom deployment steps), there's a registry key EnableDiagnostics available for you to use.

InfoPath 2010 cannot connect to SharePoint 2010

  
You have installed Office 2010 beta and you are trying to connect to SharePoint 2010 from InfoPath but you get an error

Installing and configuring SharePoint 2010

  
The following steps show how to install SharePoint 2010 on VMware workstation 7.0. Host computer used during the preparation of this walk-through was a Vista (32-bit) machine and guest machine used was VMware workstation 7.0 with Windows Server 2008 Service Pack 2 (64-bit).
Categories: 
ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend