.NET Tutorials, Forums, Interview Questions And Answers
Welcome :Guest
Sign In
Register
 
Win Surprise Gifts!!!
Congratulations!!!


Top 5 Contributors of the Month
Imran Ghani
Sohaib Khalid
Post New Web Links

How to change the order of Webparts in Sharepoint 2010 wiki pages

Posted By:      Posted Date: September 10, 2010    Points: 0   Category :SharePoint
 
In WSS you change the order of webparts just by moving them above or below another webpart. This does not work any longer in SP 2010. I want to move a list webpart above another list webpart. How can I do it [SP2010 Foundation].


View Complete Post


More Related Resource Links

Show wiki page library columns on wiki pages- SharePoint 2010

  
I created a wiki page library in SharePoint 2010 and added a few columns to the library. However, these columns do not show on the actual wiki pages as they did in SharePoint 2007. I looked through the library settings but didn't find anything to turn on this feature. Does anyone know how to do this or if this feature was even included in SharePoint 2010? Thanks.

SharePoint Wiki pages non editable after in place upgrade to SharePoint 2010

  

Hi,

We recently upgraded SharePoint 2007 SP2 farm to SharePoint 2010 farm uisng in-place upgrade. The upgrade was successful execept the Wiki pages library pages showing unusal behavior. 

All the content in Wiki pages library under the SP 2007 site were upgraded to Wiki pages library under the same site after upgrade to SP 2010. But the WIKI tool bar is not showing the Edit button on Wiki pages and hence the Wiki content is non editable. 

We did not receive any error or informtaional message in the pre-upgradecheck on prior to upgrade.

I would highly appreciate if some could help get the issue resolved.

Thanks

Sandip


Set as default master page in Sharepoint Designer 2010 does not change pages at all

  

I make a copy of V4.masterpage ,rename it as myv4.masterpage, and modify it .

then right-click myv4.masterpage and choose 'set as default masterpage'.

but when i open my site, the pages don't change, and create a new page,it still the old look.

 

Shouldn't it do that?


Sharepoint 2007 - Wiki site - New Pages Not Inheriting Custom Master Page

  

I am working on a SP site (MOSS not WSS) which is heavily customised away from the OOTB layout. I need to create a Wiki site, which was going well - I've created a master page which displays the miniconsole (this was not visible with our customised layout), and made it the default master page for the site. This has been applied to the two standard pages that come with the Wiki site, however when a new page is created, it seems to inherit the default.master, rather than my custom master page - thus not showing the miniconsole.

When I have created a new page, I am able to use SharePoint Designer to attach my custom master page to it, which works perfectly, however this will not be a viable option going forward as end-users create their new wiki pages.

How can I get the new pages to inherit my master page when they are created?

Shark


Video: SharePoint 2010: Sites as Collections of Pages

  
Find out how pages in SharePoint 2010 play a key role in the structure of a site. The developer (and the user) now has complete control of the user interface including the placement of Web parts anywhere on the page. (Length: 15:53)

How do I change the backlground and font color of a web part header - Sharepoint 2010

  
Hello,  Im verya mateur with Sharepoint so bare with me.   We are running Sharepoint 2010 and I am settingup a basic site for our company.  What I need to know is there a way to change the color of the web part header.   I have a calendar web part that displays a list of our holidays, and I was able to change the background color of the content as well as the font colors for the list of holidays,  but I cannot seem to change the background for the title box where it says Holidays and Events remains with a white background.   I would appreciate any help!   Thanks   Charlie   charlieprice@live.com

How to develop Common Content or Application pages in Sharepoint 2010, with respect to the customiz

  
  I have a top level site and subsites (which might be around 10). Where as the top level site represents a common landing page and each sub site represents a client site to which user will be directed upon login. This is a PUBLISHING web site. I need to design to start with common pages across all clients and if there is a need let the client to customize the common page accroding to their need. This is a PUBLISHING site so all these common pages should have Web parts zones with authoring capabilities. What is the best way of achieving this?    

RSS and Wiki SharePoint 2010

  
Does anyone know if SharePoint 2010 has an out-of-the-box option to subscribe RSS feeds on Wiki pages???

Failed to change Farm Account in Sharepoint 2010 server, now Central Administration is not accessibl

  
Hello, I have a problem, that I no longer can access Central Administration Website, only the Sharepoint itself. I was running installation of Sharepoint 2010 Server with administrative account ImTheAdmin, who is a Domain Admin in the domain on one of the Windows 2008 R2 member servers. Besides that, I made ImTheAdmin the primary administrator of the Sharepoint. ImTheAdmin became the only user of this Sharepoint 2010 server after installation.  I installed everything on one box with default installation settings. I used builtin SQL server, not Standard or Enterprise. What then happened is: Using ImTheAdmin account, I opened Central Administration Website, and it said, that I need to change the Farm Account, for the account for Farm was the default one (I think it was network service). So I created a regular domain user MYDOMAIN\SharepointFarmAccount. The account name was too long to be as a Windows 2000 name, so it showed there without last 't', e.g. MYDOMAIN\SharepointFarmAccoun. I thought, Windows 2000 is long gone, so I didn't pay much attention, I think everywhere the account SID is important. I don't know if that is the real problem with my failure later, but it might be one of the reasons. I put MYDOMAIN\SharepointFarmAccount down in to the form of Central Administration Website, added the check mark, that it would react to password changes, and pre

Unable to Use ToolkitScriptManager in Sharepoint 2010 webparts

  
I am trying to use ajax in my sharepoint 2010 webparts. Tried to add a calenderextender to textbox. But  the ajax funcationality is coming in to picture if i use only ToolkitScriptManager , but not for ScriptManager.(as i tested in visual studio 2010) The v4.master has got <asp:scriptmanager ... /> already.  So i can'nt add another scriptmanager(ToolkitScriptManager). Any help please?  

Adding a custom control to the SharePoint 2010 Team Site Wiki Page Template ( wkpstd.aspx ) programm

  
Topic This is maybe my last post about the Team Site Wiki Page customization with the aim of exceeding its limitations. This time we are going to customize the unique template ( wkpstd.aspx) by replacing the control that renders the editable content by a custom one. In this post example, we will take advantage of the use of this custom control to render not editable additional contents, for instance, a header and a footer that could be the same for a specific Wiki Page Library. Of course, we are not going to really customize the template, but we are going to use a delegate control to replace the control at runtime. Here are the screen shots of the result: We can see a non editable Header and Footer on the Team Site Wiki Page In edit mode these additional contents are not rendered, but we can add new content as usual And of course, after having saved the page, the new content is rendered wtih the non editable Header and Footer. Steps required   If you look at the Team Site Wiki Page template, wkpstd.aspx, you can see the control that is rendering the editable content/ <SharePoint:EmbeddedFormField ID="WikiField" FieldName="WikiField" ControlMode="Display" runat="server" /> We are first going to create a custom EmbeddedFormField control Then, we are going to use a delegate control to replace the native EmbeddedFor

Delete Page Layouts and Master Pages in SharePoint 2010

  
Hi I want to delete unwanted Page layouts and master pages in share point 2010. I tried to delete the steps mentioned below as like MOSS 1.Create a New folder 2.Move the page layouts to that New folder 3.Delete the New folder But this approach also failed.. please suggest me to delete... Thanks in Advance ArunWith Love

Sharepoint 2010: Get error: You do not have permissions to have lists and pages within My Site.

  
I am using the administrator login for the sharepoint 2010 farm.  I'm able to access My Site.  However, when I click on My content, I'm getting You do not have permissions to have lists and pages within My Site.   Any ideas?   Thanks.

Change Password for SP administrator in sharepoint 2010

  

Dear All,

What is the optimal steps to Change Password for SP administrator in sharepoint 2010 to aviod and problems .

Thanks


Session State throws error in ASP.NET Site Pages for SharePoint 2010 portal using Visual Studio 2010

  

I'm developing Visual Studio 2010 solution for site pages. I’ve created Site Pages in SharePoint 2010 and I’m trying to access Session variables in code behind in ASP.NET but it throws the following error.

Session state can only be used when enableSessionState is set to true, either in a configuration file or in the Page directive. Please also make sure that System.Web.SessionStateModule or a custom session state module is included in the <configuration>\<system.web>\<httpModules> section in the application configuration.

I set the page directive as enableSessionState=&quo

How do I change the managed accout passwords with sharepoint 2010 adna RODC

  

So we have sharepoint 2010 in a subnet that has a RODC this subnet is locked down so that all traffic to the "writable DC's" is blocked.   It was my understanding that theRODC would pass on to the "writable DC's" requests that require a write to AD.

When I try and change the managed account passwords in central admin after a few minutes I get:

Error  The specifed domain either does not exist or could not be contacted.

So I Try and change the PW with a PS script

PS C:\> C:\SHPupdates\changepass.ps1
Service Account: XXX\XXXXXXXX
Enter Password: *********************
Confirm Password: *********************

Confirm
Are you sure you want to perform this action?
Performing operation "Set-SPManagedAccount" on Target "XXX\XXXXXXXX".
[Y] Yes  [A] Yes to All  [N] No  [L] No to All  [S] Suspend  [?] Help (default is "Y"): y
Set-SPManagedAccount : The specified domain either does not exist or could not be contacted
At C:\SHPupdates\changepass.ps1:8 char:21
+ Set-SPManagedAccount <<<<  -Identity $managedAcct -NewPassword $inPass -ConfirmPassword $inPassConfirm -SetNewPassword
    + CategoryInfo&n

Sharepoint 2010 Enterprise change product key after installation.

  

Hi i have installed a Sharepoint 2010 Enterprise server and i want to change the key. I don't want to downgrade it just change the key.

I have tried to do it from central administration but its not working because i have the enterprise.

So my question is how to do it without uninstalling the product.


Categories: 
ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend