Posted By:      Posted Date: September 03, 2010    Points: 0   Category :SharePoint
Hello everyone, I am currently working on a biztalk project that has to create a task through the sharepoint webservices. Everything works fine except for the AssignedTo part. When I get the response of the getuserinfo() method, I notice that the userid I get is '87'. I then enter this userid in the AssignedTo part and send it to the updateListItems() method and the task gets created, but it is assigned to another person. When I create a task statically (by surfing to sharepoint and click add task..) and I view this task in CAML viewer I see that my userId in assignedTo is '218'. Why does the userinfo() method return an id '87' for my username while it actually is '218'? Is this a active directory problem or something like that? Hope someone can help thx

View Complete Post

More Related Resource Links

Sharepoint 2010 WorkFlow Task AssignedTo Windows Group doesnt send email notification

Hi, Which configuration would prevent sharepoint to send a notification when a workFlow task is assigned to a Windows Group with an email ? The same task with a single User send a notification. Thanks, Patrice      

How to show previouse user comments on the task form of a user in sharepoint Designer

I am using sharepoint designer for designing workflow. I have 4 steps. on each step a user write some comments for the next user. now I want to show all those comments on task form for the current user to whom the task has been assigned.

Can I create several steps to be run on a SharePoint list as a task to run on a daily basis?


We have a manual process that we do on a SharePoint list to export data from SharePoint to a spreadsheet that can then be used by non SharePoint programs.  I'd like to be able to automate this process so that it can be scheduled as a Task to run on a daily basis.   Not sure if a workflow can do what I'd like it to.  I have SharePoint Designer 2007 as well.

Here are the steps:

1. Load a particular View of a SharePoint List

2. From the view's Action menu, "Open with Access"

3. Save the resulting Access database as a file to a specific Folder on the computer hosting SharePoint

This would be run as a Task on the computer hosting SharePoint.

SharePoint leaving Assigned To field blank in a Workflow Task



We are having an issue with occasional Tasks being created by a WF that have a blank Assigned to field.  Solution consists of:

  1. A form with a People picker field that allows the user to select and validate the Authoriser name.
  2. An Auto-start-on-New SP Designer workflow runs that does a "Collect Data from User action" and assigns the Task to the Authoriser.

Unfortunately, although this worked fine during dev and test, now the solution is live and we are having 150-200 requests per day, we are finding that the WF occasionally fails to fill in the Assigned To details when it creates the Task. (approx 8 failures per 200 requests, ie 4%).

As SharePoint already has the User data field, I am confused why this might fail, and there is no obvious pattern (same auth, 4 work OK then 1 failure). 
Does SP contact the AD again when it creates the Task?

Anything else I should investigate? any suggested fix / work-arounds?


Ruth, UK

C# newbie stuck - trying to access column data in a SharePoint list in an SSIS script task

Hello, I'm sure this is the simplest question but I can't figure it out, even with Google's help. I am trying to stumble through some C# code in an SSIS script task and I am frustrated that I can't figure out how to do the easiest things.  I eventually want to find data in a column,and then use another list as a lookup to replace that value with another where the existing value matches a value in the lookup list.  So, the data in my (multiple choice) column might be "apples; bananas" and in another list I have a row that contains two columns, the first holding the value "Apples" and the second containing "Red Delicious" and my original column should read: "Red Delicious; bananas." But, alas, I can't even figure out how to see the data that is in a column. Here is my code: /*<br/> Microsoft SQL Server Integration Services Script Task<br/> Write scripts using Microsoft Visual C# 2008.<br/> The ScriptMain is the entry point class of the script.<br/> */<br/> <br/> using System;<br/> using System.Data;<br/> using Microsoft.SharePoint;<br/> using Microsoft.SqlServer.Dts.Runtime;<br/> using System.Windows.Forms;<br/> using Microsoft.SharePoint.Utilities;<br/> <br/> namespace ST_08becda4c05c49cd9f30ea76110076cd.csproj<br/> {<br/> [

Accessing "Accessibility task pane" of Sharepoint designer using API

Hi I have a requirement to add some information to Accessibility task pane. Does anybody have idea on how to access the task pane of sharepoint designer and inserting new data to it using API? I am using sharepoint desinger 2007. Regards Sujasree

Sharepoint 2007 Task List problems

I have encountered some problems with the task list web part and I wondered if anyone could suggest any solutions?   So heres what is happening. I create a new task list and check the box to have it send out emails when tasks are assigned. I create a new task, assign it to myself and I get an email, great! Then I see that everyone elses tasks are viewable in sharepoint and in outlook 2007 when I sync the webpart with that, which is no good. Okay no problem I'll make a change in the advanced settings of the webpart so 'only their own' is set for read and edit. Sounds good. However now when I create a new task and assign it to myself (just like before) I don't get an email (and nor does anyone else). (Incidently I tried reversing the item level permissions but still no emails). A second problem seems to be that people now also don't see tasks in sharepoint that have been created by someone else and assigned to them. Useful!   Any help would be much appreciated. More info can be provided as needed.

Sharepoint Task reminders

How do I setup daily Task reminders via email? The initial task request is working fine, I need to send reminders via email on open tasks. Thanks! -

How to stop the mail trigger while editing a task list item in sharepoint 2007

I have a requirement to stop the mail trigger while editing a task list item in SharePoint 2007. When I am creating a task the mail is sending to the “Assigned to” Properly. But when I am editing the same task item again a mail is sent to the Assigned to user which I want to stop. Is there any out of box feature / settings to stop this mail trigger while editing. Early response is much appreciated.Deeptyranjan

SharePoint 2007 Workflow Task Reminders

I have a simple out-of-the-box serial approval workflow that has 5-8 approvers.   Occasionally a user will get an overdue task reminder email for a task that was approved weeks ago.  The entire workflow iteself was also completed prior to the reminder email.   We are using SharePoint 2007 and Office 2007.   

[Sharepoint 2007] How to send a task from calendar on a weekly basis ?

Hi all, I have created a sharepoint calendar. I would like to create a task every week. This task should show the details of a meeting. Also a document should be uploaded every week to this meeting by the adminsitrator.   Every week a user should receive a new weekly remainder in the tasks list at 9 am.   I have been using the workflow but it is sending just one task for all the series. I would like to trigger a new task every week based on the calendar.   How can i achieve that ?   Thanks

Task assigning in Sharepoint workflow

Hi, I am designing a workflow in SharePoint designer. I have created an approval task process (Start Approval process) and assigned it to a SharePoint group. The requirement is when the task is assigned to a group, if the group has got only one user it should appear under "My task" for the user and not as "My Group Task". If the group for with the tasks has been assigned has got more than one user, the task should appear as "My Group Task". I would not like to hardcode the user ID on the workflow since it would lead to redeployment of workflow every time the user changes the department. Therefore I have created user groups for each department and users are assigned to these groups. Please assist me building up the logic. Thanks. Regards, Sriju  

create task edit form issues for sharepoint 2010 workflow using visual studio 2010

I use infopath 2007 created a task edit form and I use VS 2010 to create a sequential workflow.I want to use the custom tash edit form in the workflow.The problem I got is the InfoPath form doesn't get deployed to sharepoint. I'm able to upload the infopath form to sharepoint though central admin app. here is the element.xml :<Elements xmlns="http://schemas.microsoft.com/sharepoint/">  <Workflow     Name="WorkflowProject4 - Workflow1"     Description="My SharePoint Workflow"     Id="e6aa6cdb-667f-456a-b216-7639a1dcd3c7"     CodeBesideClass="WorkflowProject4.Workflow1.Workflow1"     CodeBesideAssembly="$assemblyname$">    <Categories/>    <MetaData>      <AssociationCategories>List</AssociationCategories>            <Task0_FormURN>urn:schemas-microsoft-com:office:infopath:TaskForm:-myXSD-2009-12-10T22-33-23</Task0_FormURN>      <StatusPageUrl>_layouts/WrkStat.aspx</StatusPageUrl>    </MetaData>  </Workflow></Elements>and here is the feature1.template.xml<Feature xmlns="http://schemas.microsoft.com/sharepoint/">  <Properties>    <Property Key="GloballyAvailable" Value="true" />    <Property Key="RegisterForms" Value="*.xsn"/>  </Properties></Feature>anything

sharepoint designer work-flow, task attachment enable

Hi I want to creat a sharepoint approval work-flow, which is sequencial so i am devloping it using sharepoint designer, but my chalange is that when it create a task for first approvar it should have an attachment option with task so when first approvar approve and want to attach anything he/she can attach refrence, then it should go to second approval and he also able to check or make additional attachment and so on can any one let me know is it possible and if then how thanks in advance

How to override the style values in a sharepoint workflow task form


I've created a aspx task form, and it's working as planned.  However, the window that is popping up when the task form fires is too small, and I would like to set the initial height/width to my own values.  How do I override the standard sharepoint css/style values so that I can control the size of the task window?


Rocky Sanders

OOTB Approval Workflow SharePoint 2010 - Blank "Requested By" field appears in Task Item edit/view f



I am having a simple OOTB  approval worflow associated to the simple document library. Task is created when an document is uploaded to the library.  When I click the task item in task list, I see a blank field "Requested By"  right below the "Status" column and I am unable to understand from where this field is coming and how to populate this field. Any help would be great...

Is it possible for a sharepoint VIEW to aggregate multiple TASK LISTS?


I have a few TASK LISTS, each with identical structure, that can't be combined initially, based on the groups that control the task lists.  ALL Task Lists reside on the same SITE.  I would like to find a way to "UNION JOIN" multiple task lists under a single Tasks List VIEW, if that can be done.  Alternately, is there a WEB PART that can do this?

Is there a way to merge multiple similar-structured task lists within a single site - and if so, how would it be done?

ASP.NetWindows Application  .NET Framework  C#  VB.Net  ADO.Net  
Sql Server  SharePoint  Silverlight  Others  All   

Hall of Fame    Twitter   Terms of Service    Privacy Policy    Contact Us    Archives   Tell A Friend